Toyota Motor Manufacturing Canada Addition, Pre-Engineered Metal Building Systems by Comsteel Building Solutions
Toyota Motoring Manufacturing Canada Addition
August 9, 2017
Cambridge Office Building Exteriors, Steel Siding Systems by Comsteel Building Solutions
Cambridge Office Building Exteriors
August 9, 2017
Show all

Perth County Emergency Medical Services

Service Provided:

Pre-Engineered Metal Building System


Project Location:

Stratford, ON


Building Size:

14183 Square Feet


Project Description:

A new Emergency Medical Services headquarters facility based in Stratford. The project was a design-build/performance program built to meet post-disaster criteria with numerous evolving changes during design and construction to meet the owner’s specific needs. The roof assembly is a stand-off assembly with galvanized standing seam roof and 12” fibreglass insulation. The walls are also cavity insulated with interior liner and exterior 7/8 Corrugated siding installed horizontally. Architectural design by R. Ritz Architect, Stratford.