Comsteel Building Solutions - Decast Plant Addition - Pre-engineered Metal Building Systems
Decast Plant Addition
September 8, 2019
Manitoulin Transport
September 8, 2019
Show all

West Lincoln Multi-Use Recreation Centre

Service Provided:

Pre-Engineered Metal Building System


Project Location:

Smithville, ON


Building Size:

52,000 Square Feet


Project Description:

A new recreation centre for the Township of West Lincoln features a pre-engineered metal building with a standing seam roof system and 4” insulated metal wall panels. The project was design-build with numerous evolving changes during design and construction to meet the owner’s specific needs. The building includes a one pad arena with seating area, walking track, change rooms, gymnasium and meeting rooms. Architectural design by Architecture49.